CHANNEL CLEANING
EXCAVATION
SADDLE RIVER
Consisted of dredging/excavating of acculated sediment along the Saddle River, de-snagging of downed trees restricting the flow of water, as well as channel bank armoring to protect the banks from being erroded.
SPENCE ENGINEERING
PROJECT VALUE: $600,000.00